On October 10, 2016, the NRC issued a Notice of Violation to Florida Power & Light for a Severity Level III violation involving Turkey Point Nuclear Plant's failure to maintain complete and accurate records as required by 10 CFR 50.9(a). Specifically, on multiple occasions between November 2014 and April 2015, Fire Watch Shift Supervisors initialed and signed hourly fire watch logs indicating that hourly fire watches had been completed, with all required areas checked, when on multiple occasions some areas had not been checked or hourly fire watches had not been performed at all.